Skip to content
Chessington World
Chessington World
  • Home
  • Explore Chessington
    • Adventure Point
    • Chessington Zoo
    • Forbidden Kingdom
    • Land of the Dragons
    • Land of the Tiger
    • Mexicana
    • Rainforest
    • Shipwreck Coast
    • Wanyama Village and Reserve
    • Wild Asia
    • Wild Woods
    • World of Jumanji
  • The History of Chessington
  • Good to know
  • Chessington EXTRA
  • World of Jumanji NEW FOR 2023
  • Home
  • Explore Chessington
    • Adventure Point
    • Chessington Zoo
    • Forbidden Kingdom
    • Land of the Dragons
    • Land of the Tiger
    • Mexicana
    • Rainforest
    • Shipwreck Coast
    • Wanyama Village and Reserve
    • Wild Asia
    • Wild Woods
    • World of Jumanji
  • The History of Chessington
  • Good to know
  • Chessington EXTRA
  • World of Jumanji NEW FOR 2023

Chessington Construction 2013

  • Home
  • Chessington Extra
  • Chessington Construction 2013

Here is some of the construction from Chessington in 2013

January 2nd

The Creaky Cafe the new indoor replacement for Re-Fresh and the Burger Kitchen replacing Burger King continue to be refurbished. Also the Ice Factory appears to be having some work done, not surprising if this was to change with Ben and Jerry’s very popular next door.

January 13th

The Creaky Cafe coming on very nicely, will be yet another indoor place to sit and eat at Chessington. The Burger Kitchen is now blanked off out of view as work continues, and unless I missed it last year the Photo Licence is going to hit for 2013.

February 2nd

The new Creaky Cafe has now opened, the old Burger King is under going a huge front reface as part of the Burger Kitchen refresh. The Vampire/Bubble Works shop has also had a complete re-fit inside ready for the new season.

February 20th

We continue our closed season Chessington updates with a look to how the Burger Kitchen is developing. The fascia looks like it will be similar to recently opened Creaky Cafe, wooden front completely changed from the previous looking buildings. Also the finishing touches to the Creaky Cafe and the strange place for the Vampire parts…

March 23rd

We get our first look at ZUFARI, as well as the completed Burger Kitchen in Transylvania. Dragon Falls is also seen withour rock work with a new set of stairs for Rameses Revenge.

April 1st

With rock work being removed from Dragon Falls, the ride is still undergoing Winter checks.

May 1st

With continues around the park with Runaway Train also having the old rock work removed, the ride remains closed.

June 21st

After opening with seatbelts, ZUFARI has a lap bar installed also bringing the height restriction down to 1m. Runaway Train looks bare with the rock work removed. An inncident on Rameses Revenge has now shut the ride.

September 25th

Work around the animal area really picks up, as the park starts to prepare for Halloween.

December 21st

Close season is now well underway at the park with Safari Skyway undergoing a lot of work.

Popular Pages:

  • World of Jumanji
  • Mandrill Mayhem
  • Ostrich Stampede
  • Mamba Strike
  • Contact Us