Zufari update 13/01/13

A trip to Chessington sees a small Zufari update. As many will know (as posted on our Chessington Site) the Giraffes arrived at the park this week with the Zufari truck being used in the video and indeed on site. Whilst to many it still looks just like dirt, a lot of work has been done to the visible site over the past 10 days. A fair amount of land has been flattened, shingle has appeared on site and a more road looking road has started to take shape. In addition in the Wanyama Village what looks like a potential access path to the top end of the ride seems to be starting to take shape. For those that have yet to see the ride will feature:

It will be a 10th themed land on it’s own called Zufari,
It will have an On-ride photo,
It will be subject to Fastrack,
Minimum height: 1.10 metres, Anyone under 1.30 metres must be accompanied by a person aged 16 or over.

The trucks themselves have storage facilities under the seats, looks like all belongings will make the journey on Zufari.

DSC00230 DSC00232 DSC00234 DSC00236 DSC00237 DSC00241 DSC00243 DSC00244 DSC00246 DSC00248 DSC00250 DSC00251 DSC00252 DSC00263 DSC00264 DSC00266 DSC00267 DSC00268 DSC00270

 

See all previous Zufari construction here. And don’t forget to join us on FACEBOOK

Tagged , , , , , . Bookmark the permalink.

Comments are closed.