| Other Construction This makes up various pieces of construction from both parks over the past few years, right up to present time. 2002, 2003, 2004 2005, 2006, and 2007 next page. 2007 >>>>> 2008 >>>>> With thanks to Thorpe Park for the use of the Rush Artwork. |
| 2003 Two pictures from 2003 include the new ride for the year Eclipse in construction stages, and then on the other end Calgary Stampede at the end of the season. At the bottom, pictures of Quantum testing on opening day, and weeks when the ends were still on the ride, which were removed due to weight issues. |
| 2004 Samurai the new ride had its most downtime in 2004, the other thing that happened in the park was the Teacup Twisters becoming Storm in a Teacup, Exclusively reveiled name and pictures here during close season. |
| 2002 Zodiac didn't have the best time in 2002, infact the ride opened for a max of 5 weeks (and that may be a little generious!) Now up and running this is what it looked like at the start of 2002. |
| 2005 Quite alot has happened in 2005 with the obvious construction of Rush, new screaming swing for 2005. |
| Early April |
| April 29th - First video of testing! HERE |
| April - Samurai not functioning well with more downtime. |
| May 6th - Still waiting for all the air tanks to be fully installed, however the area is nearly fully prepared. |
| May 8th - Rush is now up and running, and by the looks of things at full speed too! Videos of testing also: Video 1 Download Video 2 Download |
| September 30th - With Detonator being down for just over a week, cables looked to have arrived so the ride can be up and running before Fright Nights. |
| 2006 April - Close season repairs on Rush are in evidence |
![]() |
![]() |