![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Other Construction Construction from 2005, 2006, and 2007 with various rides featured. Including the sly exit of Rodeo back in 2005, which stayed in tack through 2006 but with no operation. |
| 2005 Rodeo was the big news for not opening, especially when it was still very much there! |
| May 26th - Rodeo is now well on the way to deconstruction, and Rameses current looks like its a motor missing. |
| June 16th - Rodeo is now really gone, the area is closed and the cars have been removed. |
| August 30th - I'm supprised Rodeo is still there! I would think that it may be going for scrap as its not been removed and kept together. |
| 2006 April 20th - Small part of downtime at Chessington with two popular rides having some down periods, however its great to see Chessington having a re-paint of Billy's Whizzer while the ride is down having its motor replaced. |
| 2007 February 10th - Chessington Zoo with limited rides open for half term, many rides in the walk area still in pieces, includes Sea Storm, Rattlesnake, and various others. |
| March 25th - Chessington is now open for 2007, however there are more than the usual probelsm with ride closures, with four still under going major repairs. Al pictured below is Rodeo finally removed from the park, and a few others. |
![]() |
| June - The extension to the Gorilla area looks to be taking place, with buiding on the side. |
![]() |
| July - The extension to the Gorilla continues. |
![]() |
| September - The extension to the Gorilla continues. |
![]() |
| October - The extension to the Gorilla is nearly complete. The news and the construction of the Sealife centre starts. |
![]() |
![]() |
![]() |
| Other Construction This makes up various pieces of construction from both parks over the past few years, right up to present time. 2005, 2006, 2007 and 2008 next page. 2008 >>>>> |
![]() |
| Search |
| Network |
|
|